Application note / Heavy crude

Heavy-crude transport is a whole-system decision.

A mobility concept must work along the route and at the receiving facility. Viscosity is one part of that assessment.

Pipeline manifold with gate valves at an onshore facility, illustrative application scene — illustrative brand scene
Pipeline Manifold Illustrative brand scene · Visual credits
01

Define a comparable duty

Establish throughput, crude properties, line conditions and the existing heating or diluent strategy. Compare alternatives against a common boundary.

02

Test transport and restart

Rheology, mixing, stability and representative flow behavior inform the application. Include shutdown and restart, materials and pumping requirements.

03

Account for the receiving end

Assess emulsion breaking, crude recovery, separated-water quality and the water-handling requirement. Added water can change both transport and receiving constraints.

04

Evaluate net value

Include chemistry, equipment, energy, heating, diluent, water, waste and logistics. A pilot should verify the complete operating result before expansion.

Basis and intended use

Roven application perspective, developed from the company’s defined technical scope and qualification approach. This article explains assessment considerations; it does not report a completed Roven project or measured customer result.

Issue 01 · October 2026. The test methods, acceptance criteria and specialist responsibilities are agreed for the actual application.